
09/07 26 51149 Rev. 1
Section 4: Operations
SYSTEM BOOT-UP PROCEDURE
Initiate the power up sequence using the power ON/OFF rocker switch located
on the bottom-left side of the instrument.
Normal indications include the following:
─ Lights on the keyboard should blink.
─ After approximately one minute, the Fairbanks Logo appears along
with a mouse pointer, located approximately in the center of the screen.
─ The Fairbanks Logo disappears.
─ A Windows welcome screen appears.
─ Lastly, a weighing application window appears.
Commenti su questo manuale